The Home Building Act gives an owners corporation six years from completion to sue for a major defect, and two years for anything else. It also gives a narrow extension: if a breach of warranty first becomes apparent in the last six months of that period, proceedings can be commenced up to six months after it ends. For a strata building that finds a serious problem in year five, that extension is often the whole case.

Raysons Constructions Pty Ltd v The Owners, Strata Plan No 87003 [2026] NSWCATAP 324, decided by the NCAT Appeal Panel on 20 October 2026, is the clearest statement yet of what an owners corporation has to prove to rely on it. The owners corporation lost the appeal. The reasons explain why, and they set out, item by item, what a scheme now needs to have on paper.

How the extension works

Section 18E(1) of the Home Building Act 1989 requires proceedings for breach of a statutory warranty to be commenced before the end of the warranty period: six years where the breach results in a major defect, two years otherwise. For a new strata building, section 3C fixes completion, and so the start of the clock, at the issue of the occupation certificate for the whole building.

Section 18E(1)(e) then allows proceedings to be commenced within a further six months after the warranty period ends, if the breach of warranty becomes apparent within its last six months. Section 18E(1)(f) says a breach becomes apparent when any person entitled to the benefit of the warranty first becomes aware, or ought reasonably to have become aware, of it. The extension is available for both major and non-major defects.

In NCAT this is not a defence the builder has to raise. Commencing within time is part of the Tribunal's jurisdiction, so the Tribunal must be satisfied of it whatever position the builder takes.

What happened in Raysons

The building is a 59 lot strata scheme at Meadowbank, built in 2013 and 2014. The final occupation certificate issued in July 2014, so the six year period for major defects ended on 18 July 2020. The owners corporation filed in NCAT on 27 November 2020, outside six years but inside the extended window, which ran to 18 January 2021.

To use the window, the owners corporation had to show that the breaches it sued on first became apparent between 18 January and 18 July 2020. Its case was that it only became aware of them through a building consultant's report delivered in June 2020, after inspections in May that year. The builder's case was that lot owners had been complaining about cracking, water ingress and drainage since late 2014, so the owners corporation knew long before the final six months.

The procedural history is a lesson in itself. The Tribunal heard the matter in September 2021 and decided it in July 2023, largely in the owners corporation's favour. An Appeal Panel overturned that in 2024 and dismissed the proceedings as out of time. The Supreme Court set the Appeal Panel's decision aside in 2025, in The Owners, Strata Plan 87003 v Raysons Constructions Pty Ltd [2025] NSWSC 66, where Leeming JA settled the legal principles. The builder's appeal then went back to a differently constituted Appeal Panel, which has now allowed it and sent the whole matter back to the Tribunal to be decided again. The owners corporation must pay the builder's costs of the appeal. In 2025 Leeming JA had observed that it would not surprise him if each side's legal costs already exceeded the amount at stake.

The owners corporation carries the onus

The central error was about who had to prove what. The Tribunal had approached the extension as though the builder had to prove the owners corporation knew of each breach before 18 January 2020. The Appeal Panel held that was backwards. Following Leeming JA, the party seeking to rely on section 18E(1)(e) must establish the facts that entitle it to the extension. That is the owners corporation, and it must prove that it was not aware, and ought not reasonably to have been aware, of each breach relied on until the final six months.

That is a demanding burden. It means proving a negative, across years of building history, for every item in the claim.

Is your scheme close to the six year mark?

Whether a late claim is in time usually depends on what was known, by whom, and when. Our Strata and Community Title team can review the scheme's records and the defects before the window closes.

Free consultation

A defect is not a breach of warranty

The second principle cuts in the owners corporation's favour, and it is the reason the case was not simply lost.

Leeming JA drew a sharp line between a defect and a breach of warranty. A defect is physical: a crack, a stain, water where it should not be. A breach of warranty is a legal conclusion about how the work was designed or built. Knowing about the first does not automatically mean knowing about the second. Sometimes the inference that a breach has occurred is obvious; sometimes a patent defect needs further investigation before anyone could say the work was deficient.

Two consequences follow. First, the question is asked breach by breach. If one breach was apparent early, that does not knock out the others, so a single old complaint does not sink a whole claim. Second, the owners corporation cannot escape simply by showing the defects in its claim are described differently from the early complaints. The question is whether, in light of what was known, it was or ought to have been aware of each breach now alleged. The Supreme Court also said it was unhelpful to talk about a "duty to investigate" borrowed from negligence cases, because the statutory question is different.

The test has a subjective and an objective limb, and it applies to any person entitled to the benefit of the warranty. In a strata scheme that can include the owners corporation itself and individual lot owners, so complaints made by owners to the committee or strata manager years earlier are squarely relevant.

Major defect still has to be proved, item by item

Because the claim was filed after six years, every item also had to be a major defect under section 18E(4). The Appeal Panel found the Tribunal's reasons on that question fell below the minimum acceptable standard. Findings were stated as conclusions, often after a brief reference to one expert, without explaining why the other expert's contrary evidence was rejected or how the defect actually affected the use of the building.

Three points from that part of the decision are useful. An expert does not need to use the words "major defect" for their evidence to establish one; the Tribunal has to analyse the lay and expert evidence against the statutory criteria. Waterproofing is a major element under the definition, so a finding that experts had not addressed major elements in a water ingress case was plainly wrong. And where an item had been repaired between the two experts' inspections, the Tribunal had to deal with the builder's argument that there was no longer a defect at all, let alone a major one.

One finding survived. The Tribunal had found the car park slabs were cracked beyond what the applicable Australian Standard and the Building Code allow, so the builder breached the warranty in section 18B(1)(c) that work will comply with the law. The builder did not displace that finding, and the Appeal Panel noted that building to the design does not excuse non-compliance with the law. But whether that breach was a major defect, which decides whether it was in time, had never been determined.

The owners corporation also did not press its claim under section 37 of the Design and Building Practitioners Act 2020, because it fell outside the Tribunal's time-limited jurisdiction under section 48K of the Home Building Act.

Extra time after the warranty ends
6 months
Proceedings filed
Nov 2020

What an owners corporation now has to put on paper

The most practical part of the decision is the list of matters the owners corporation must address before the remitted hearing. It is, in effect, a checklist for any scheme relying on the extension:

  • which defects or deficiencies are relied on
  • which people, whether committee members, the strata manager, lot owners or occupants, are said to have known of each defect, actually or constructively
  • when that knowledge was acquired
  • which people are said to have known, on the owners corporation's behalf, of each breach of statutory warranty, and when and how
  • which specific warranty in section 18B is said to have been breached for each defect
  • which deficiencies have already been the subject of enforcement, when and in what circumstances
  • why each defect is a major defect, by reference to the actual lay and expert evidence

What it means for builders and developers

For builders the decision confirms that the owners corporation must prove its entitlement to the extension, and that a documented history of complaints is real evidence against it. A late claim is not in time just because the expert report arrived in the final six months.

But it does not follow that one early complaint defeats the whole claim, because the inquiry is breach by breach. And on the car park slabs the Appeal Panel repeated that work which fails to comply with an applicable Standard breaches the warranty in section 18B(1)(c) even where the builder followed the design.

How this applies across NSW

Section 18E applies identically across the state. What varies is the age and type of strata stock now reaching the end of its six year period, which is where this question arises.

Macquarie Park, Ryde and the North Shore

The Raysons building is at Meadowbank, in the Ryde corridor that runs into Macquarie Park, one of Sydney's densest apartment markets. Much of the medium and high-density stock there and around Chatswood and St Leonards was built within the last decade, so many schemes are now approaching or inside their final six months. We have advised owners corporations in Macquarie Park and the North Shore.

The Hills and Western Sydney

The Hills sits at the centre of the North West Growth Area and Blacktown carries one of the state's largest new-dwelling pipelines. Schemes registered in the growth years are reaching the same point, often with committees that have changed several times, which makes reconstructing who knew what and when harder. We have advised schemes in The Hills and Blacktown.

Central Coast and Illawarra

Around the Central Coast and Wollongong, smaller schemes often rely on a strata manager's records rather than an active committee. Those records are usually the strongest evidence of when a problem was first raised.

If your scheme is nearing the six year mark, or has just received a report identifying serious defects, the first questions are what was known before the final six months, by whom, and whether each item can be shown to be a major defect. Our Strata and Community Title team advises owners corporations and strata managers on defect claims and time limits, working with our Building and Construction team on the technical side. For the groundwork on what counts as a defect and a major defect, see our article on what counts as a building defect in NSW. Get in touch for a free consultation.

This publication is intended as general information only and does not constitute legal advice. Please seek independent legal advice before acting on anything contained in it.

Liability limited by a scheme approved under Professional Standards Legislation.

Frequently asked questions

Can an owners corporation sue after the six year warranty period ends?

Sometimes. Under section 18E(1)(e) of the Home Building Act, if a breach of warranty first becomes apparent in the last six months of the warranty period, proceedings can be commenced within a further six months after it ends. The owners corporation must prove it qualifies.

Who has to prove the extension applies?

The owners corporation. In Raysons Constructions v The Owners, Strata Plan 87003, the Appeal Panel held the Tribunal was wrong to make the builder prove the owners corporation knew earlier. The party relying on the extension must prove it was not, and ought not to have been, aware of each breach sooner.

Does knowing about cracks or leaks mean we knew about the breach?

Not automatically. A defect is a physical problem; a breach of warranty is a legal conclusion about how the work was done. Sometimes the inference is obvious, sometimes investigation is needed. The question is whether the owners corporation was, or ought to have been, aware of each specific breach it sues on.

Does one early complaint defeat the whole claim?

No. The inquiry is made breach by breach. An early complaint about one problem may stop that item using the extension without affecting other breaches that genuinely first became apparent in the final six months. Each item has to be examined against the evidence of what was known and when.