The Cheaper Quote: When an Owners Corporation's Repair Falls Short

November 9, 2026
·
9
min read
MA
Matthew Armota
Principal, Archer Lawyers
About Matthew →

A waterproofing failure is found behind a shower. The owners corporation accepts that it is common property and its responsibility. Then two quotes arrive. One removes the damaged and mould-affected material and rebuilds properly. The other, for a fraction of the price, treats the surface, seals it in behind a new membrane and calls the job done, often with a note from the contractor that the material should come out eventually and no warranty that the problem will not return.

Committees choose the cheaper quote more often than lot owners expect. Whether that choice satisfies the law turns on one question: does the work leave the common property in a state of good and serviceable repair? The price is not the test, and neither is whether the committee acted reasonably.

What section 106 requires

Section 106(1) of the Strata Schemes Management Act 2015 requires an owners corporation to "properly maintain and keep in a state of good and serviceable repair" the common property. Section 106(2) adds a duty to renew or replace fixtures and fittings comprised in the common property.

The courts read that duty strictly. In Seiwa Pty Ltd v Owners Strata Plan 35042 [2006] NSWSC 1157, Brereton J held, of the identically worded provision in the previous Act, that it is not a duty to use reasonable care, best endeavours or reasonable steps, but a strict duty to maintain and keep in repair. His Honour also explained that maintenance means keeping the property in proper order before it falls out of condition, so that it can serve the purpose for which it exists, and that the duty extends to remedying defects in the original construction.

Two consequences matter for the cheaper quote. First, the owners corporation is judged on the result. A committee that genuinely believed it was saving the scheme money still breaches section 106 if the work leaves the problem in place. Second, waterproofing exists to keep water out of the building fabric. Work that leaves known damaged material behind a new membrane has to be capable of doing that job for the long term, not just looking finished.

A cheaper method is allowed. A fix that does not fix is not.

Nothing in section 106 requires the most expensive quote, or any particular method. A committee is entitled to compare scopes and choose the more economical one, provided it achieves good and serviceable repair. Often it will.

The difficulty arises when the cheaper scope, on its own terms, is not a permanent repair. The warning signs usually appear in the quote itself:

  • it is described as interim, temporary or make-safe work
  • the contractor recommends that the affected material be removed at a later stage
  • it carries no warranty against the problem recurring, while the alternative does
  • it leaves in place material a consultant has identified as damaged or contaminated
  • no one independent of the contractor has said the method will last

A contractor's own caveat is hard to argue past. If the person doing the work says it is not the final fix, an owners corporation that adopts it as the final fix is likely to struggle to show that the common property is in good and serviceable repair.

Interim work is a step, not an answer

Make-safe work is often sensible. It can stop damage spreading while a proper scope is prepared, quoted and funded. The problem is when the interim step quietly becomes the permanent position.

Section 106 gives an owners corporation very little room to defer. Section 106(4) allows it to defer repairing damaged common property only while it takes action against an owner or another person in relation to that damage, and only if the deferral will not affect the safety of the building or anyone's access to or use of the common property or a lot. Budget pressure is not one of the grounds.

If a committee approves interim work, the minutes should say so and record when and how the permanent repair will be done. That protects the committee as much as the lot owner.

Has your owners corporation approved a repair you do not think will last?

Whether the work meets the section 106 standard usually turns on the scope, the consultant's evidence and what was decided. Our Strata and Community Title team can review it with you.

Free consultation

Opting out takes a special resolution

An owners corporation can decide not to repair a particular item, but not by a committee decision or by default. Under section 106(3), the duty does not apply to an item only if the owners corporation determines by special resolution, which must be passed at a properly convened general meeting, that it is inappropriate to maintain, renew, replace or repair it, and that decision will not affect the safety of any building, structure or common property or detract from the appearance of any property in the scheme.

Failed waterproofing with mould in the wall cavity is a poor candidate for that exemption, because leaving it is likely to affect the building fabric. It is still worth checking the minutes, the by-laws and any common property memorandum, because section 106(7) makes the duty subject to those documents. A renovation by-law passed for an earlier owner of the lot, for example, can make the owner of that lot responsible for the bathroom's waterproofing.

Who pays when the repair goes through your lot

Repairing a shower recess or a shared wall usually means opening up the lot owner's tiles, fixtures and finishes, sometimes in a second room. Section 122 allows the owners corporation to enter a lot to carry out work it is required to do, with the occupier's consent or a Tribunal order, or at any time in an emergency.

Section 122(6) then makes the owners corporation liable for any damage to a lot or its contents caused by or arising out of that work or entry, unless the damage arose because the owners corporation was obstructed or hindered. In practice, the cost of making good lot property disturbed by common property repairs generally sits with the owners corporation, provided the owner gives access. Owners should agree in writing, before work starts, what will be reinstated and to what standard.

What a lot owner can do

Start in writing. Ask the strata manager for the committee's decision, both quotes and scopes, and any consultant's report, and ask specifically whether the approved work is intended as the permanent repair. If it is described as interim, ask when the permanent repair will be done.

If the problem returns, or the owner suffers loss in the meantime, section 106(5) allows a lot owner to recover from the owners corporation, as damages for breach of statutory duty, any reasonably foreseeable loss suffered as a result of the breach. Lost rent while a bathroom cannot be used is a common example. Under section 106(6), the claim must be brought within six years after the owner first becomes aware of the loss.

Where the disagreement is about what work should be done, an owner can apply to NCAT, which can make orders to settle a dispute about an owners corporation's failure to exercise a function under the Act (section 232). In most cases mediation must be attempted first, usually through NSW Fair Trading (section 227).

What a committee should do before accepting the cheaper quote

  • Ask a consultant independent of both contractors whether each scope will achieve a lasting repair, and get the answer in writing.
  • Compare what each scope leaves behind, not only what it costs.
  • Read the exclusions and warranty terms side by side.
  • If interim work is approved, minute it as interim and set a date for the permanent repair.
  • If the building is less than six years old, ask whether the failure is a defect the builder should fix.

That last point can change the economics entirely. Under the Home Building Act 1989, an owners corporation generally has six years from completion to claim for a major defect and two years for other defects, and waterproofing is a major element. A failed membrane in a newer building may be the builder's cost rather than the scheme's. Our articles on what counts as a building defect in NSW and on the six-month warranty extension explain how those claims work.

How this applies across NSW

Section 106 applies the same way to every strata scheme in the state. What changes is the building stock, and so which version of this problem a scheme is likely to face.

Older schemes on the North Shore and the Central Coast

In older schemes the membranes are often original, and a failure found in one bathroom tends to raise questions about the others built at the same time. That is where the cheaper quote is most tempting, because the committee can see the same bill coming more than once. We have advised owners corporations and lot owners on the North Shore and the Central Coast.

Newer apartments in Macquarie Park, The Hills and Blacktown

In buildings still within the statutory warranty period, the first question is whether the failure is the builder's responsibility, before the owners corporation spends its own money on any repair, cheap or otherwise. We have advised schemes in Macquarie Park, The Hills and Blacktown.

Our principal, Matthew Armota, answered a reader's question on this issue for LookUpStrata, which you can read here.

If your owners corporation has approved a repair you do not think will last, or you are on a committee weighing two very different quotes, our Strata and Community Title team advises lot owners, owners corporations and strata managers on repair obligations and disputes. Get in touch for a free consultation.

This publication is intended as general information only and does not constitute legal advice. Please seek independent legal advice before acting on anything contained in it.

Liability limited by a scheme approved under Professional Standards Legislation.

Frequently asked questions

Does an owners corporation have to accept the most expensive repair quote?

No. Section 106 does not require any particular method or price. It requires the result: the common property must be kept in a state of good and serviceable repair. A cheaper scope is fine if it achieves that. It is not fine if, on its own terms, it leaves the problem in place.

Can a strata committee approve a temporary repair?

Yes, as a step. Make-safe work can be sensible while a permanent scope is prepared and funded. But section 106 only allows deferral in narrow circumstances, and budget pressure is not one of them, so interim work should be minuted as interim with a plan for the permanent repair.

Can an owners corporation decide not to repair common property?

Only by special resolution at a general meeting under section 106(3), and only if the decision will not affect the safety of any building, structure or common property or detract from the appearance of any property in the scheme. A committee cannot make that decision on its own.

Who pays to reinstate my bathroom after common property repairs?

Generally the owners corporation. Section 122(6) makes it liable for damage to a lot or its contents caused by work or entry for common property repairs, unless the damage arose because it was obstructed or hindered. Agree the reinstatement scope in writing before work starts.

How long do I have to claim against the owners corporation?

Under section 106(6), a lot owner cannot bring an action for breach of the section 106 duty more than six years after first becoming aware of the loss. Keep a record of when problems were reported and when losses such as lost rent began.

What if the building is less than six years old?

Check whether the failure is a building defect the builder or developer should fix. Under the Home Building Act, waterproofing is a major element, and an owners corporation generally has six years from completion to claim for a major defect. That can shift the cost away from the scheme.